| Year |
Supply |
Installation |
Location |
| 2009 |
Oil Desalting Module, Oil Separation, TEG Gas Dehydration, Fuel Gas Conditioning Module |
FPSO |
Ghana |
| 2009 |
Molecular Sieve Dehydration, CO2-Acid Gas Removal (Membrane) |
FPSO |
Brazil |
| 2009 |
Gas Sweetening Package (Amine) |
Offshore |
Canada |
| 2009 |
Chemical Injection Skids, Seawater Injection Systems,, Seawater Filtration & Deaeration skids |
FPSO |
Nigeria |
| 2009 |
Seawater Filtration & Deaeration skids |
Offshore |
China |
| 2009 |
Gas Sweetening Package (Amine) |
FPSO |
Brazil |
| 2008 |
Produced Water Treatment Unit with Induced Gas Flotation and Reinjection Pumps Module, Flare Knock Out Drums |
FPSO |
Australia |
| 2007 |
Production Separator, Electrostatic Treater, Glycol Skid |
FPSO |
Angola |
| 2007 |
Flare Package, Glycol Package, Seawater Treatment & Injection Package |
FPSO |
Brazil |
| 2007 |
Produced Water Treatment Package, Crude Stabilitzation, Reinjection Module, Flare Knockout Module, Inlet Separation |
FPSO |
Australia |
| 2007 |
Full topsides modules including commissioning |
FPSO |
Indonesia |
| 2007 |
Oil Separator, Test Separators, |
FPSO |
Angola |
| 2007 |
Compression Suction Scrubbers, Fuel Gas Scrubbers |
Onshore |
Russia |
| 2006 |
Production Separator |
Offshore |
UAE |
| 2006 |
Glycol Regeneration Package |
Onshore |
Indonesia |
| 2006 |
Chemical Injection Skid, Seawater Injection Skid, Nitrogen Generation Package, Gas Dehydration Package |
FPSO |
Malaysia |
| 2006 |
Electrostatic Coalescer Internals |
FPSO |
New Zealand |
| 2006 |
TEG Glycol Regeneration Package, Gas Dehydration, Production Separator |
Offshore |
Vietnam |
| 2006 |
Test Separator, HP Separator |
Offshore |
Gulf of Mexico |
| 2005 |
Oil Separator, Test Separators, Production Separator, Electrostatic Treater, Glycol Skid |
FPSO |
Brazil |
| 2004 |
Condensate Stabilization & Compressor |
Onshore |
Malaysia |
| 2003 |
Oil Production Separator, Test Separator, Electrostatic Coalescer, Knock-out Drum, Glycol Package |
FPSO
|
Cote d'Ivoire |